Get in Touch
Gibraltar Global Cable Barrier System

Case Studies

Missoula, Montana

Contractor: Mountain West Holding System: TL-4 3 Cable Linear Feet: 65,500 ft. Challenge:  First Installation of the Gibraltar Cable Barrier System for Mountain West Random safety audits are performed on Highway Construction projects for insurance purposes.  It was imperative the product allows for safe & proper  installation. Need to minimize the time the crew is […]

Learn More

Ingham/Clinton Counties, Michigan

Ingham/Clinton Counties, Michigan Contractor: Action Traffic Maintenance, Inc. System: TL-4, 3 cable. Driven Terminals & Driven Sockets with 10.5′ post spacing Linear Feet: 10,710 LF & 8 Terminals Challenge: This installation was on a stretch of roadway with a crossover history. This project is a trial test of our driven terminal section (with alterations) by […]

Learn More

Alberta, Canada

Alberta, Canada Contractor: Alberta Highway Services System: TL4- 4 Cable Linear Feet: 432,960 ft. / 323 miles of cable Challenge: The cable barrier was being installed on 80 miles of one of the busiest stretches of highway in Canada. The installation required 6 crews to work together: Cable Loading Crew Socket Planting Crew Post Driving […]

Learn More

Testimonials